Heavy rain triggered by a low-pressure system disrupted road connectivity in Malkangiri district on Saturday, with floodwaters flowing over the Poteru bridge on NH-326, bringing traffic between Malkangiri and Motu to a standstill.
Floodwaters disrupt NH-326 in Malkangiri, schools shut
- Post author:Er. Vishnu
- Post published:September 12, 2026
- Post category:Uncategorized
- Post comments:0 Comments
